Design


A visual artist worked in one school in each of the two areas developing the play’s visual concept.


Young people considered the script and looked at how to visually bring the script to life in a practical, three-dimensional way for touring.

The final set design consisted of three metal structures which represented the different spaces and were enhanced with ribbon elements woven by the two schools.



Home Phase 1-2019 Phase 2-2020 Project Team Funders Education Pack

REConnecting Lincolnshire
The Lincoln Diocesan Board of Education
103 Newport, Lincoln LN1 3EE, England / 01522 594016

info@reconnectlincs.co.uk

ReConnecting Lincolnshire

The Diocese of Lincoln Education Board

103 Newport, Lincoln LN1 3EE, England 01522 594016